In yet another development relating to Clean Water Act (CWA) Section 401 water quality certifications, a recent policy directive from the Department of the Army could impose tighter timeframes for a state to review whether projects comply with state water quality standards. The U.S. Department of the Army has issued a policy directive memorandum requiring the U.S. Army Corps of Engineers (USACE) to adhere to a “default time period” of 60 days for states to act on a request for water quality certification under CWA Section 401 in conjunction with USACE’s issuance of dredge and fill permits under CWA Section 404. The directive also requires USACE to “immediately draft guidance” to establish criteria for USACE District Engineers to identify circumstances that may warrant additional time for states to decide on an application for water quality certification.
More Posts
D.C. Circuit Clarifies that States have Maximum of One Year to Decide on Water Quality Certification Applications
Pipeline Safety Act Reauthorization: Will a New Congress Mean New Mandates?
Long Awaited Plastic Pipe Rule Finalized
Inspector General to Audit LNG Safety Oversight
EPA’s Replacement for the Clean Power Plan (the Proposed Affordable Clean Energy Rule): Potential Impacts to the Oil and Gas Industry
Industry Impact from Criminal Verdict in Pipeline Oil Spill
Hurricane Preparedness in High Gear on East Coast
Draft Pipeline Risk Modeling Report Issued for Public Comment
As LNG Permitting Delays Continue, PHMSA to Assist FERC
Subscribe: Subscribe via RSS
Blogs
Firm/Org