On September 20, 2018, FERC dismissed Nevada Hydro Company, Inc.’s (“Nevada Hydro”) request that (1) the Lake Elsinore Advanced Pumped Storage (“LEAPS”) facility is a transmission facility and (2) LEAPS is entitled to cost-based rate recovery under the California Independent System Operator Corporation’s (“CAISO”) Transmission Access Charge. FERC found that Nevada Hydro’s request is premature because LEAPS has not been studied in the CAISO Transmission Planning Process (“TPP”) to determine whether it addresses a transmission need identified through that process, and, if such a need were met, how the facility would be operated.
Latest Post
More Posts
FERC, NERC Announce Inquiry into January 2018 Cold Weather Event
Third Circuit Rejects Multiple Challenges to Pennsylvania Water Permit for Atlantic Sunrise Project
Third Circuit Grants in Part Request to Review Transco Expansion Project
FERC Denies Complaint Regarding PG&E’s Order No. 890 Compliance
FERC Suggests Interstate Power Flows Could Be Coming to ERCOT
Fourth Circuit Dismisses Constitutional Challenges to NGA Pipeline Certificate Process
FERC Affirms Policy on Income Tax Allowance for Gas Pipelines
FERC Proposes Reforms to Regulations Governing Interlocking Positions
D.C. Circuit Rejects Challenges Alleging FERC Due Process Violations
Subscribe: Subscribe via RSS
Blogs
Firm/Org