On May 21, 2026, FERC denied a complaint filed by Gaston Green Acres Solar, LLC (Gaston) and Bethel NC Hwy 11 Solar, LLC (Bethel) (collectively, with Gaston, Complainants) against PJM Interconnection, L.L.C. (PJM) arguing: (1) PJM’s Open Access Transmission Tariff (Tariff) is unjust and unreasonable because it prevented Complainants from withdrawing their generation projects from PJM’s generator interconnection process Transition Cycle No. 1 without penalty, and (2) in the alternative, FERC should order PJM to issue Bethel its own generation interconnection agreement (GIA) if PJM’s Tariff is not deemed to be unjust and unreasonable in this regard. FERC denied the complaint, finding the Complainants did not satisfy their burden under Federal Power Act section 206, failed to identify Tariff provisions requiring the issuance of a GIA for Bethel, and did not demonstrate that PJM violated its Tariff.
Latest Post
More Posts
FERC Approves Virtualization CIP Reliability Standards and Definitions
DC Circuit Upholds PJM’s Sunset of EER Participation in Capacity Auctions
MISO to Expand Number of Interconnection Requests it Can Study on Expedited Basis
FERC Accepts SPP’s Provisional Load Interconnection Process
D.C. Circuit Denies Sierra Club’s and Appalachian Voice’s Petition for Review of FERC Order Authorizing Construction and Operation of Natural Gas Pipeline
FERC Requires New England Transmission Owners to Answer 2023 Annual Update Information Requests
FERC Reauthorizes Transco’s Northeast Pipeline Project
FERC Grants Waiver Request to Prevent Termination of Interconnection Service to the Palisades Nuclear Plant
FERC Denies Great Basin Transmission’s Request for Transmission Rate Incentives
Subscribe: Subscribe via RSS
Blogs
Firm/Org